ColumbiaMagazine.com
Printed from:

Welcome to Columbia Magazine  
 



































 
Tolling to begin in Louisville and Southern Indiana crossings

I-65 and East End bridges will be tolled
Click on headline for complete story and chart of tolls

By Ryan Watts, Kentucky Transportation Cabinet

LOUISVILLE, KY (Tue 30 Dec 2016) - Drivers traveling in Louisville and Southern Indiana need to prepare for the start of tolling on three Ohio River bridges. Tolling on the Louisville - Southern Indiana Ohio River Bridges Project is scheduled to begin Friday, December 30, 2016.

Tolled bridges include the two I-65 bridges connecting Downtown Louisville and Southern Indiana, the new Abraham Lincoln Bridge and the improved John F. Kennedy Memorial Bridge. The new East End bridge connecting the Gene Snyder Freeway in Prospect, KY, with State Road 265 in Utica, IN will also be tolled.



RiverLink is the name of the new, all-electronic tolling system that makes the project possible. There's no stopping, no slowing, no lines and no coin machines. Toll rates range from $2-$12, depending on the size of vehicle and whether the driver has a RiverLink account and transponder.

Drivers with transponders will pay the lowest toll rates. Drivers can set up a prepaid RiverLink account to get a transponder. All E-ZPass transponders, including the I-PASS from Illinois and the Indiana Toll Road E-ZPass, will work with the RiverLink system. No further action is necessary.

Drivers without transponders will get bills in the mail, and pay higher toll rates. Drivers who do not pay their tolls will be charged a penalty and may face restrictions on vehicle registration until tolls and penalties are paid.


Opening a RiverLink Account


Drivers can open a personal account online at www.RiverLink.com, by phone at 855-RIV-LINK or in person at one of two RiverLink customer service centers. A personal account can include up to four vehicles, with a minimum balance of $20 to open the account. The account balance rolls over month to month.

The fastest way to open a RiverLink personal account is online. The website is available 24 hours a day/7 days a week with no wait. Transponders will be mailed to account holders, free of charge.

For businesses with more than four vehicles, the fastest and easiest way to open an account is by calling a specialized customer service representative at 855-RIV-LINK.

Choice of transponders

A RiverLink local transponder is free, one per registered vehicle. The small sticker adheres to the inside of windshield, is non-transferable and will work only on tolled bridges between Louisville and Southern Indiana.

A RiverLink E-ZPass transponder is $15 per transponder. It's mounted on the inside of the windshield, is portable from vehicle to vehicle registered to a single account and works in all 16 E-ZPass states (https://e-zpassiag.com/about-e-zpass/where-can-i-use-it).

The I-64 (Sherman Minton) and the US 31/Second Street (Clark Memorial) bridges across the Ohio River will not be tolled in connection with the project. Find more information at www.RiverLink.com.

The Louisville - Southern Indiana Ohio River Bridges Project includes two new bridges and their approaches, an improved Kennedy Bridge and reconstruction of the Kennedy Interchange, where I-65, I-64 and I-71 come together in downtown Louisville. The new Abraham Lincoln Bridge carries six lanes of I-65 northbound traffic. The improved Kennedy Bridge carries six lanes of southbound traffic. The new East End bridge will connect the Gene Snyder Freeway in Prospect, KY. with State Road 265 (Lee Hamilton Highway) in Utica, IN.

Find more details on the Ohio River Bridges Project at http://www.kyinbridges.com.


This story was posted on 2016-12-13 11:37:44
Printable: this page is now automatically formatted for printing.
Have comments or corrections for this story? Use our contact form and let us know.



River Link bridges will charging tolls Fri 30 Dec 2016



2016-12-13 - Frankfort, KY. - Photo from Kentucky Transportation Cabinet.
Drivers traveling in Louisville and Southern Indiana need to prepare for the start of tolling on three Ohio River bridges. Tolling on the Louisville - Southern Indiana Ohio River Bridges Project is scheduled to begin Friday, December 30. Tolled bridges include the two I-65 bridges connecting Downtown Louisville and Southern Indiana, the new Abraham Lincoln Bridge and the improved John F. Kennedy Memorial Bridge. The new East End bridge connecting the Gene Snyder Freeway in Prospect, KY, with State Road 265 in Utica, IN, will also be tolled. Rates are in the chart above.

Read More... | Comments? | Click here to share, print, or bookmark this photo.



 

































 
 
Quick Links to Popular Features


Looking for a story or picture?
Try our Photo Archive or our Stories Archive for all the information that's appeared on ColumbiaMagazine.com.

 

Contact us: Columbia Magazine and columbiamagazine.com are published by Linda Waggener and Pen Waggener, PO Box 906, Columbia, KY 42728.
Phone: 270.403.0017


Please use our contact page, or send questions about technical issues with this site to webmaster@columbiamagazine.com. All logos and trademarks used on this site are property of their respective owners. All comments remain the property and responsibility of their posters, all articles and photos remain the property of their creators, and all the rest is copyright 1995-Present by Columbia Magazine. Privacy policy: use of this site requires no sharing of information. Voluntarily shared information may be published and made available to the public on this site and/or stored electronically. Anonymous submissions will be subject to additional verification. Cookies are not required to use our site. However, if you have cookies enabled in your web browser, some of our advertisers may use cookies for interest-based advertising across multiple domains. For more information about third-party advertising, visit the NAI web privacy site.